Pacific Palisades · Fire Rebuild Guide

Rebuilding in the Palisades, starting from the outside in.

Thousands of homes were lost in the January 2025 Palisades Fire, and families are still working through plans, permits and builders. This page explains, in plain terms, what the building code now asks of a roof and exterior, how the city's expedited rebuild path works, and where an exterior contractor fits beside your architect and general contractor.

Pacific Home Exteriors is a licensed, insured contractor (CSLB License #1160357). We work with your builder or general contractor to handle the trades we offer: roofing, gutters, ember-resistant vents, windows and doors, exterior paint and stucco finish, pavers and turf.

Where the Rebuild Stands

A steady look at the facts,
as of October 2026.

The Palisades Fire started on January 7, 2025, and was contained on January 31. CAL FIRE's incident record lists 23,448 acres burned, with 6,845 structures destroyed and 975 damaged, counting homes, businesses and other buildings. Behind every one of those numbers is a family or a neighbor, and we write this page with that in mind.

The city moved early to speed rebuilding. Emergency Executive Order 1, signed by the Mayor on January 13, 2025, directs city departments to expedite permit reviews and inspections and to allow homes to be rebuilt to their previous design without discretionary review. The city's rebuild program describes "Eligible Projects" as by-right rebuilds that are not subject to the California Environmental Quality Act or the Coastal Act. The first rebuilding permit was issued on March 5, 2025, and the first certificate of occupancy for a rebuilt Palisades home followed on November 21, 2025.

The most recent city-reported figures we found are from early July 2026: rebuilding permits issued for 1,419 properties, with 28 addresses cleared for occupancy. Numbers move every week, so for the current count and for your own parcel, use the City of Los Angeles recovery site at recovery.lacity.gov and the Palisades permitting page at emergency.lacity.gov/Palisades-Permitting.

One more resource worth bookmarking: the State Fire Marshal's parcel viewer at osfm.fire.ca.gov shows the fire hazard severity zone for your address, which determines which parts of the building code apply.

Facts on this page are drawn from CAL FIRE, the City of Los Angeles, LADBS and local news reporting, and are current as of October 2026. Rules and counts change; the city's own pages always control.

What the Code Asks For

The roof and exterior,
layer by layer.

Chapter 7A of the California Building Code covers construction in wildfire-exposed areas. These are the exterior items your plan reviewer will look at.

Roof assembly

In Los Angeles Very High Fire Hazard Severity Zones, the standard call is a Class A roof assembly, installed exactly to its published listing and the manufacturer's instructions. The assembly matters more than the shingle alone: underlayment, flashing and edge details are part of it.

Ember-resistant vents

Since the 2021 code cycle, attic and roof vents are expected to be tested and listed to ASTM E2886, which tests resistance to embers, flame and radiant heat. Older plain mesh vents no longer qualify. Your vent product should appear on CAL FIRE's Building Materials Listing.

Gutters and covers

Gutters collect leaves and embers at the roof edge. Gutter material and debris protection are part of the exterior review. We confirm the current requirement with LADBS before we quote, and we name the product in writing.

Windows and glazed doors

Chapter 7A allows several ways to meet the window standard, commonly multi-pane glazing with at least one tempered pane, or a tested fire-rated assembly. Your architect specifies the performance; we match the product and the opening.

Walls, eaves and trim

Exterior wall, eave and soffit assemblies are expected to be ignition-resistant or noncombustible. These choices are set in your plans, and they affect paint and stucco finish selections later.

The first few feet

The state has been developing rules for an ember-resistant zone close to the structure. We do not assume the final wording; we confirm the status with your builder and the city, then plan any pavers or hardscape near the walls to match.

This is a homeowner summary, not code text or permit advice. Chapter 7A applies to new buildings, additions and alterations in Very High Fire Hazard Severity Zones, and details change between code editions. We confirm the current requirement with LADBS before we quote.

The Expedited Path

How the city's rebuild
process is set up.

A summary of how the city describes it. Your architect and the city decide which path your project follows.

1. Eligibility

A like-for-like rebuild is generally one that restores the destroyed home to its previous design, up to about 110 percent of its original size, in substantially the same location. The city decides whether a project qualifies as an Eligible Project.

2. Plans and permitting help

The city set up rebuild-focused permitting help, including a One-Stop Rebuilding Center and a Palisades Inspections and Permitting Support Center, where homeowners and contractors can get technical help from several departments.

3. Permit fees

City Ordinance 188985 waives city permit and plan check fees, including LADBS fees, for rebuild work up to 110 percent of the original area. It applies to the person who owned the property at the time of the fire, has a program cap, and runs for a limited period. The LADBS refund and waiver guide has the details.

4. Debris and site readiness

Government debris removal ran in two phases: hazardous materials first, then debris and ash removal by the U.S. Army Corps of Engineers. Your builder and the city confirm your parcel's sign-off and soil requirements before construction. We do not advise on that step.

5. Inspections in sequence

Structure, sheathing and framing come first. Roofing, vents, gutters and windows follow your builder's schedule, and each is inspected at its stage. Good coordination here saves weeks, which is why we ask for the plan set early.

6. Your builder leads, we deliver our trades

Your builder or general contractor owns the permit set and the schedule. We price, schedule and install our trades under that umbrella, coordinated so the roof, vents and windows land in the right sequence.

Official sources: Palisades Permitting, Recovery.LACity.gov and the LADBS fee waiver guide. Confirm office hours and requirements with the city before you visit or submit.

Where Pacific Fits

Beside your architect
and your builder.

What Pacific does

  • Roofing: Class A assemblies, flashing and edge details, installed to listing.
  • Ember-resistant vent selection and installation, with the listed product named in writing.
  • Seamless gutters and gutter protection.
  • Windows and doors to your architect's schedule.
  • Exterior paint and stucco finish, with sample patches viewed in your own light.
  • Pavers, hardscape and turf where the plan and the rules allow.
  • A line-item written scope, and a conversation with your architect and builder about sequence.

What your architect and builder handle

  • Design or engineering. That belongs to your architect and engineer.
  • Debris removal and soils work. Those run through the government program and your geotechnical engineer.
  • Permit dates. The city sets those; we have our submittals ready so nothing waits on us.

We hold no city or program status. What we offer is licensed, insured work on the trades we know, led by our founder, Carolina, and a team that listens before it quotes. The photos below are Pacific work from across Southern California.

Before You Hire

Questions to ask any contractor
on your rebuild.

These apply to us, too. Please ask them of everyone.

  1. Check the license yourself. Search the contractor's number on the Contractors State License Board site at cslb.ca.gov. Look at the license status, classification, bond and any complaint history. Ours is CSLB License #1160357.
  2. Ask which roof assembly, by name. A Class A claim should come with a specific, listed assembly: the covering, underlayment and installation method. Ask to see the listing, not just a brochure.
  3. Ask for the vent product and its listing. Request the vent make and model and confirm it is listed to ASTM E2886 on the CAL FIRE Building Materials Listing, in the orientation it will be installed.
  4. Ask for current insurance certificates. General liability and workers' compensation certificates, sent directly from the insurance agent to you or your builder.
  5. Get the scope in writing, line by line. Materials, brands, gutter and flashing details, cleanup, warranty terms and a payment schedule tied to finished work.
  6. Ask how they will coordinate with your builder. Who confirms dimensions, who schedules inspections, and what happens if the plans change.
The Exterior Scope

Five parts of the envelope,
planned together.

Roofing

A new roof is installed once the structure is ready for it. We price from your plan set, name the assembly and flag any mismatch between drawings and code before work is scheduled.

Gutters and downspouts

Seamless runs sized to the roofline, with drainage that fits your grading and landscape plan, and debris protection chosen to the current review.

Windows and doors

Product choices matched to the architect's window schedule and to the glazing requirement for your zone, with installation timed to the weather-tight stage.

Paint and stucco finish

The last visible layer. Colors are tested on your walls in morning and evening light before a final decision, and coatings are matched to the wall assembly in your plans.

Pavers and hardscape

Noncombustible paving near the house, planned alongside your landscape designer. Turf is considered farther from the structure, where rules and insurers allow.

Gallery

Our work,
across Southern California.

These photos are Pacific work from across Southern California. None of them is a Palisades rebuild.

Related Pages

Nearby, and
county wide.

Pacific Palisades roofing

Our page for Palisades homes that are repairing, reroofing or planning ahead.

Malibu

The neighboring coastal city, with its own fire history and re-roofing policy.

Los Angeles County

Every city and community we serve across the county.

Before You Call

Rebuild questions,
answered plainly.

Will Pacific act as our general contractor?

We work alongside your builder or general contractor and handle the trades we offer: roofing, gutters, ember-resistant vents, windows and doors, exterior paint and stucco finish, pavers and turf. Your architect designs, your builder runs the project, and we price, schedule and install our scope to match the drawings and the city's requirements, with one written scope and one point of contact for that work.

When in the rebuild should we talk to an exterior contractor?

Earlier than most people expect, and without any rush to hire. Roof pitch, vent locations, window sizes and gutter runs are often settled while plans are still in design, so a price and a short list of questions at that stage can save a revision later. Installation itself follows your builder's schedule, after framing and the inspections that come first.

Does the 110 percent size allowance limit what we can build?

The expedited path is written around rebuilding up to about 110 percent of the original size, in substantially the same location, and the city decides whether a project qualifies. A larger or substantially different design is not forbidden; it generally follows the standard review process instead. Your architect and LADBS can tell you which path your plans fall on.

Is artificial turf a good idea near a rebuilt home?

Turf is a landscape choice, not a fire barrier. Near the house we usually lean toward pavers, gravel or other hardscape, and we confirm what the current rules and your insurer expect before we put turf in a quote. Farther from the structure, low-water turf can still make good sense. We will tell you plainly which areas we would use it in.

How do you handle the paperwork when code upgrades are involved?

We give you an itemized written scope that names the roof assembly, the vent product and the glazing type, so you and your insurer can see exactly what is being installed. Ask your insurance company how code-required upgrades are treated under your policy; we are not insurance advisors, but a clear scope makes that conversation easier.

Bring us the plans.
We will take it from there.

If you are working with an architect or builder, send us the exterior pages when you are ready. There is no pressure and no deadline. We will tell you what we see, in writing, and where we would confirm a requirement with the city first.

Schedule a Free Inspection